project 

Major Drilling Head Office

location

Treaty 1, Rosser, MB

size 

27,500 ft2

year 

2020

status

built

the people

Major Drilling Group required a new headquarters that would unify office, shop, and warehouse operations into a single facility. f-BLOK worked closely with Major Drilling through functional programming and site visits to existing facilities, gaining a clear understanding of workflows, operational needs, and long-term growth plans.

Led by f-BLOK in collaboration with Concord Projects, RAM Engineering, KGS Group, and Dean Spearman Landscape Architect, the project was delivered through a design-build process with strong coordination and regular engagement. Bi-weekly design meetings ensured alignment across all stakeholders, supporting a responsive and integrated design approach. The process prioritized collaboration, creating shared environments that bring together office, shop, and warehouse staff while supporting the specialized work of the organization.

the process

the result

The 27,500 ft2 headquarters combines Major Drilling’s operations into a high-performance facility that reflects the company’s identity and supports future growth. The design integrates office, shop, and warehouse functions while fostering connection and efficiency across all users.

To achieve these objectives, the project emphasized collaboration, flexibility, and a strong architectural expression tied to the company’s work in the field.

Key features and program elements include:

  • Two-storey office component with perimeter offices and full-height curtain walls maximizing natural light and views

  • Central open staircase and feature wall that anchors collaborative spaces and encourages interaction

  • Shared lunchroom and staff patio designed to accommodate both daily use and larger gatherings

  • Integrated shop and warehouse spaces, including a mezzanine designed for future expansion

  • Operational planning informed by existing facilities, optimizing workflow and adjacencies

  • Design-build delivery with phased planning to support current needs and long-term growth

  • Infrastructure upgrades, including increased HVAC capacity, washroom provisions, and enhanced fire ratings for future scalability

  • Environmental strategies including EV charging and energy performance exceeding code, targeting a 20% reduction in energy use

  • Architectural expression inspired by drilling operations, with vertical elements, materiality, and colour reflecting geological processes

The result is a unified headquarters that supports Major Drilling’s operations while reinforcing its brand and culture. By combining functionality, flexibility, and a strong design identity, the facility creates a collaborative environment that connects people, process, and place.

Photography by David Lipnowski.

post

As part of our continued relationship with Major Drilling, f-BLOK was invited back to expand their office areas to support their growing workforce.

Peggy May Legacy Centre

Maple Leaf Construction

Neeginan Centre

3 storey apartment building with picket fence .

WHRC Affordable Housing

Long Plain First Nation

Cohabit

Hillsboro House Refresh

Launch Coworking

f-BLOK Achitecture - Collabs - APC Greenhouse (1)

APC Greenhouse

Deer Lake First Nation Housing Development

De Lucas South Landing

Commissionaires MB Offices

Brandon Cultural Hub

Teepee is set up in front of the Attawapiskat Youth Centre's patio. There are benches around the teepee and on the patio in the background. Community youth are walking around.

Attawapiskat Youth Centre

Previous
Next