project
GDI Head Office + Warehouse
location
Treaty 1, RM of McDonald, MB
size
19,000 ft2
year
2019
status
Completed
the people
Gypsum Drywall Interiors Ltd. (GDI) is a growing contractor requiring a facility that could keep pace with expanding operations while supporting day-to-day efficiency. f-BLOK worked closely with GDI and the design-build team from the outset, exploring multiple design options and conducting detailed costing exercises to align the project scope with budget and schedule constraints.
Led by f-BLOK as architectural consultant, the team guided planning, design, and documentation while coordinating closely with the builder to ensure a seamless transition from GDI’s previous location. Particular attention was given to operational workflows, site access, and timing, as the project needed to meet critical occupancy deadlines. This collaborative approach continued beyond completion, with f-BLOK re-engaged in 2022 to design a warehouse expansion supporting GDI’s ongoing growth.
the result
The 19,000 ft2 head office and warehouse consolidates GDI’s operations into a single, efficient facility designed to support both administrative and industrial functions. Balancing office comfort with warehouse durability, the building provides a streamlined environment that enhances productivity while accommodating future expansion.
To achieve these objectives, the design focused on operational flow, site efficiency, and adaptability, ensuring the facility could evolve alongside the business.
Key features and program elements include:
Modern office spaces and meeting rooms supporting administrative and project coordination needs
A spacious lunchroom and fully equipped locker facilities to enhance staff comfort and wellbeing
Extensive warehouse and storage areas designed for efficient material handling and organization
Optimized site layout including loading zones, overhead doors, and secure storage areas
Careful planning of truck circulation and maneuverability to support daily operations
Phased and responsive design approach to meet tight occupancy timelines
Building configuration that allows for future expansion, including the 2022 warehouse addition
The result is a practical, high-performing facility that supports GDI’s current operations while providing flexibility for continued growth. By aligning design decisions with budget, schedule, and operational needs, the project delivers long-term value and reinforces GDI’s position in the local construction industry.